PDHengineer continuing education for engineers consumers and corporate

PDHengineer PDH CEU CPC CPD - top white line

 

PDHengineer for engineers continuing education

OnlineChatSoftware

PDH CEU CPC CPD spacer

Courses | Webinars | Write a Course | FAQ | Contact Us | My Account

PDH online courses and webinars
PDHengineer
Explore all PDH CEU CPC CPD and Webinars for Engineers

 

This course accepted in:

 

• Alabama (P.E.)

• Alaska (P.E.)

• Arkansas (P.E.)

• Florida (P.E.) (AOP)

• Georgia (P.E.)

• Idaho (P.E.)

• Illinois (P.E.)

• Iowa (P.E.)

• Kansas (P.E.)

• Kentucky (P.E.)

• Louisiana (P.E.)

• Maine (P.E.)

• Maryland (P.E. Category A)

• Minnesota (P.E.)

• Mississippi (P.E.)

• Missouri (P.E.)

• Montana (P.E.)

• Nebraska (P.E.)

• Nevada (P.E.)

• New Hampshire (P.E.)

• New Jersey (P.E.)

• New Mexico (P.E.)

• New York (P.E.)

• North Carolina (P.E.)

• North Dakota (P.E.)

• Ohio (P.E.)

• Oklahoma (P.E.)

• Oregon (P.E.)

• Pennsylvania (P.E.)

• South Carolina (P.E.)

• South Dakota (P.E.)

• Tennessee (P.E.)

• Texas (P.E.)

• Utah (P.E.)

• Virginia (P.E.)

• West Virginia (P.E.)

• Wyoming (P.E.)

 

 

 

Abbreviations:

AOP-Areas of Practice

LAR-Laws & Rules

P.E.-Professional Engineers

 

Explore all PDH CEU CPC CPD and Webinars for Engineers

Stormwater Detention in Urban Drainage Design

Course No. C-6007

Credit: 6 PDH

Course Fee: $164.95 Purchase course

Subject Matter Expert: Scott Underwood, P.E.

Overview

This course is intended to present recommended design procedures and guidelines for use in complying with the requirements of Section 1-303.03 Stormwater Storage.

The main purpose of a detention basin is to store excess runoff thus reducing peak discharges downstream. Detention basins should be considered when increased runoff due to highway activities would cause additional damage to downstream property or would worsen flooding conditions. The cost of a detention basin should be compared to other methods of mitigation, such as downstream channel improvements or purchasing flood easements, to determine the most feasible solution.

A detention facility should be designed to project an image acceptable to the public. Multiple use of detention facilities is also a major means of gaining public acceptance for the stormwater management facility. Because an area used for detention of runoff may have other uses; the size, shape and slopes of the detention facility should be compatible with such auxiliary uses of the facility. In addition, the allowable depth of water for the design discharge and the length of time that stored water remains in the facility should also be compatible with other uses of the facility.

In this course, the student will review Chapter 12 of the Illinois Department of Transportation Drainage Manual. This course is relevant to municipal engineers, highway engineers, and consulting engineers serving private developers.

The student must take a multiple-choice quiz consisting of thirty (30) questions at the end of this course to obtain PDH credit.

 

Specific Knowledge or Skill Obtained

This course teaches the following specific knowledge and skills:

  • General considerations for detention storage
  • General Design Procedures
  • Outlet Structure Hydraulics
  • Flood Routing Techniques
  • Detention Storage Routing
  • Linear Stormwater Detention
  • Example Problems

 

Course

Click on the following link to the PDF document to review the course material before taking the quiz for credit.

Stormwater Detention Document 1

Stormwater Detention Document 2

 

Having trouble downloading the PDF file?

If clicking the link does not bring you to the PDF file, then right-click the link. Click "Save Target As" and save on your desktop. To view the file, double-click the icon on your desktop and return to this page to take the quiz. You may want to bookmark this page for your convenience. If you have questions, Live Support Chat can help.

Get Adobe ReaderYou may need Adobe Reader to view this document. Click on the link to download a free copy of the latest version of Adobe Reader.

 

To receive PDH credit for this course, you must pass a multiple-choice quiz. Click the button below to Purchase Course and Take Quiz. To take the quiz, your computer must be set to accept cookies. See how to check your cookie settings.

 

Purchase PDHengineer course